Construction Sites Heavy Machinery EV Charging

Construction sites heavy equipment EV charging | Ampernext
One of the biggest problems that we have in the city environment is noise. At Ampernext we have the solution.

Share This Post

One of the biggest problems that we have in the city environment is noise. And construction sites are the ones that generate a big portion of it. To fight this, all big construction equipment companies already have and plan to continue releasing heavy-duty machinery that is purely electrical. Here comes the demand for fast charging with high power at places where usually there is no, or very weak AC infrastructure.

At Ampernext we have the solution. Our mobile chargers can be connected to a battery to provide EV charging directly on the construction site or at a temporary location. Put them on a trailer, truck, van, etc. and move them from one place to another. Designed for flexibility and ready to be mounted and deployed wherever it’s needed.

Available in 60kW and 240kW versions.

More To Explore

Synergia Microgrid DC Hub Ampernext

Industrial DC Power Platforms & Integrated Microgrid EMS by Ampernext

When Ampernext was founded, the EV charging world looked very different.
The accepted path was clear: AC-coupled architectures, centralized systems, and the assumption that charging infrastructure would always depend on increasingly larger grid connections.
That was simply how things were done.